# Pre-Commissioning Checklist download

**URL:** <https://forumautomation.com/t/pre-commissioning-checklist-download/6356>\
**Category:** Field Instrumentation\
**Created:** [May 8, 2019, 6:25pm UTC](https://forumautomation.com/t/pre-commissioning-checklist-download/6356 "2019-05-08T18:25:35Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![sivaranjith](https://forumautomation.com/letter_avatar_proxy/v4/letter/s/ba9def/32.png) [@sivaranjith](https://forumautomation.com/u/sivaranjith)\
**Post date:** [May 8, 2019, 6:25pm UTC](https://forumautomation.com/t/pre-commissioning-checklist-download/6356/1 "2019-05-08T18:25:35Z")

</div>

Commissioning is a method used to verify that a plant has been built, procured, manufactured, assembled, tested and ready for service in compliance with design sketches and requirements.

Finishing the [**pre-commissioning**](https://forumautomation.com/t/pre-commissioning-tests-for-process-loop/6157) operations marks the end of the “Mechanical Completion.” At the end of the pre-commissioning phase, the plant status thus reached is called “Ready For Commissioning (RFC).”

The objective of this "Pre-commissioning checklist " is to provide a detailed, uniform system for verification, inspection, testing, documentation and preparing for the operation.

# Download Pre-commissioning checklists:

### General Pre-commissioning Checklist

Here is the general Pre-Commissioning checklist for plant commissioning. The general procedures include inspection, Control system, controller, final control element, wiring checklists etc.,

 ![precomm%20checklist](https://cdn.forumautomation.com/original/2X/d/d895c30c597adabec5bb690f9e24c7a0a23341fd.png)

> ## Download: [pre commissioning checklist.docx](https://cdn.forumautomation.com/original/2X/5/523cdd8ba8bb19af92a3a656b6acd2b2d0290550.docx) (32.1 KB)

### Pre-Commissioning checklist for HVAC system:

Here is a simple checklist that can be used HVAC system commissioning. The checklist contain standard instrument check and other facilities.

 ![precom%20hvac](https://cdn.forumautomation.com/original/2X/0/0dc709808386c81bead2654ca06a83feff88d6fc.png)

> ## [Pre-Commissioning CHECKLIST for HVAC.docx](https://cdn.forumautomation.com/original/2X/4/4eaaac2a4b5378af851062ef8054e39a4d9c59a6.docx) (31.1 KB)

### Pre-Commissioning checklist for Pumps:

This checklist is an example of the pre-commissioning checklist for field control element.

 ![pre%20comm%20pump](https://cdn.forumautomation.com/original/2X/2/2b0601df724c8ec8ec2b45e7382cbcff1cf1a5cb.png)

> ## [PRE Commissioning checklist pump.docx](https://cdn.forumautomation.com/original/2X/e/e5ddd3b3be8d24a3055353fe645ef69900f61c56.docx) (31.0 KB)

> [@Pre-Commissioning and Commissioning checklist for Variable Speed Drives (VSD)](https://forumautomation.com/t/pre-commissioning-and-commissioning-checklist-for-variable-speed-drives-vsd/894):
>
> Variable Speed Drive (VSD) Pre-Commissioning checks for VSD - 1.Power and motor cables are correct- Size and termination 2.Power cable shields correctly earthed to PE terminal 3.No faults on the cables prior to energize the VSD - Megger 4.Controls cable correctly installed and terminated 5.Control cable shield correctly earthed at one end only. 6.Check cooling fan connection and conform that correct voltage tap is selected on the auxiliary transformer Commissioning of VSD When pre commissio…