# How to Perform an Insulation Resistance Test on a Transformer?

**URL:** <https://forumautomation.com/t/how-to-perform-an-insulation-resistance-test-on-a-transformer/14681>\
**Category:** Electrical\
**Tags:** transformer\
**Created:** [November 27, 2026, 2:10pm UTC](https://forumautomation.com/t/how-to-perform-an-insulation-resistance-test-on-a-transformer/14681 "2026-11-27T14:10:53Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![Rabert](https://forumautomation.com/user_avatar/forumautomation.com/rabert/32/6784_2.png) [@Rabert](https://forumautomation.com/u/Rabert)\
**Post date:** [November 27, 2026, 2:10pm UTC](https://forumautomation.com/t/how-to-perform-an-insulation-resistance-test-on-a-transformer/14681/1 "2026-11-27T14:10:53Z")

</div>

#### How to Perform an Insulation Resistance Test on a Transformer?

**[Megger testing](https://forumelectrical.com/standard-operating-procedure-sop-for-megger-testing-of-ht-transformer/)** of an 11 kV / 433 V distribution transformer is performed to assess the insulation condition between the HV winding, LV winding, and earth.

 ![1](https://cdn.forumautomation.com/original/2X/f/f413a2b5f63406adffa35632eff3c162ac7414e2.jpeg)

The procedure involves isolating the transformer, disconnecting external connections, selecting the appropriate test voltage, and conducting HV-to-Earth, LV-to-Earth, and HV-to-LV insulation resistance tests.

Record 15-second and 60-second readings, calculate DAR and PI where applicable, account for temperature variations, and compare results with previous test records and manufacturer data.

Ensure proper discharge and earthing after each test and restore all connections safely.