# Batch facility on a controller

**URL:** <https://forumautomation.com/t/batch-facility-on-a-controller/102>\
**Category:** Industrial Automation\
**Created:** [October 3, 2014, 12:49pm UTC](https://forumautomation.com/t/batch-facility-on-a-controller/102 "2014-10-03T12:49:47Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![instrumen](https://forumautomation.com/letter_avatar_proxy/v4/letter/i/65b543/32.png) [@instrumen](https://forumautomation.com/u/instrumen)\
**Post date:** [October 3, 2014, 12:49pm UTC](https://forumautomation.com/t/batch-facility-on-a-controller/102/1 "2014-10-03T12:49:48Z")

</div>

Whenever a deviation persists for a long time the controller output saturates at the maximum of minimum output (-2.5 VDC or + 12.5 VDC/0 kPa or 140 kPa) depending on the controller action. In a normal controller when the process reverts to normal the output takes its time to come into control range.

In a batch controller the output reverts to the control limit (0VDC OR 10.00V DC 20 kPa or 100 kPa) as soon as the deviation enters the batch limits
